Wednesday, 4 September 2013

Frack Free Sussex Cuadrilla have withdrawn 2 applications pertaining to their Balcombe site

(101) Frack Free Sussex
Cuadrilla have withdrawn 2 applications pertaining to their Balcombe site, but be ye not lulled, they are regrouping.
They've been caught out on technicalities/legalities because of the extra scrutiny we've collectively forced and the searchlight that's been shone on their reprehensible attempts to get away with all sorts, but the euphemisms on what constitutes fracking are still being manipulated and they are reapplying.
They may even hope to restart in the winter when they think noone will be prepared to camp out. Even if they decide that Balcombe is too much like hard work because of the huge local resistance .. they have designs on plenty other places .. and the BPs and Exxons are not far behind them.

http://www.bbc.co.uk/news/uk-england-sussex-23944344

No comments:

Post a Comment